Monday, May 19, 2008

Battery Room Interior

Recap of the installed components, and how the wooden mounting board gradually evolves over time. The first SCC (Apollo T-80):

The first installed load:

The second SCC (Morningstar TS-60):

The connection box:

Rearranging the wires:

The remote display for the T-80:

The remote monitoring component for TS-60:

The overall layout:

No comments: